Projects

P176-P276

Total disassembly of injectors and mechanical parts, Replacement of the mould-holder columns and revision of toggle Replacement of PLC and PC inserting the latest software generation for control and monitoring of machine parameters, Replacement of all hydraulic pipes and modification of hydraulic unit to insert the Energy Saving Vera® system. Providing complete manuals in any […]

SP480

Total disassembly of injectors and mechanical part, Replacement of the mould-holder columns and revision of toggle, Replacement of PLC and PC inserting the latest software generation for control and monitoring of machine parameters, Replacement of all hydraulic pipes and modification the hydraulic unit to insert the Energy Saving Vera® system. Providing complete manuals in any […]

ROSS

Total disassembly of injectors and mechanical part, Teplacement of the mould-holder columns and revision of toggle, Teplacement of PLC and PC inserting the latest software generation for control and monitoring of machine parameters, Teplacement of all hydraulic pipes and modification the hydraulic unit to insert the Energy Saving Vera® system. Providing complete manuals in any […]

E266

Total disassembly of injectors and mechanical part, replacing the mould-holder columns, Adjustment of balancing device with total replacement of heating plate and insulating plate, replacement of the screws and barrel opening stroke transformation from 250mm to 350mm, modified to accommodate moulds with total thickness up to 330mm, replacement of PLC and PC inserting the latest […]